Funnels
No through-wall ties required.
Simple, quick assembly and disassembly.
Superior dimensional accuracy and surface quality.
Integrated working platform and safety scaffolding.
- 1. Uplift protection to tie the funnel-shaped formwork.
- 2. Reinforcement work, installation of inserts.
- 3. Reinforcement complete – uplift protection plate assembled.
- 4. Assembly of the funnel-shaped formwork (supporting steel skeleton).
- 5. Funnel-shaped formwork assembled, ready for concrete work.
- 6. Continuous concrete work, optimum compacting, maximum concrete drop 50cm.
- 7. Disassembly of funnel-shaped formwork.
- 8. Funnel after stripping of formwork.