
Climbing Brackets: CR-250
Climbing bracket for great formwork sets.
Main features:
Scope: Civil engineering and non residential building.
- Platform width: 2.5m.
- Formwork area up to 35 m2 per two brackets set.
- Anchorage on wall: DW20 (possibility to use DW15).
- Roll-back system: 70cm with carriage and rack system or 5cm with tilt-back system.
CR-250 brackets in pier execution with pouring, intermediate, main and cones recovery platforms. The access is provided by BRIO scaffolding ladder.

Detail of formwork vertical regulation using bottom screw jack. This regulation can be done without releasing the clamps connecting vertical walers and formwork
System Components:
1 Climbing bracket CM-220
2 Main platform
3 Pouring platform
4 Cone recovery platform
5 Roll-back system
6 Push-pull prop
7 Vertical waler
8 Anchorage
9 Formwork
2 Main platform
3 Pouring platform
4 Cone recovery platform
5 Roll-back system
6 Push-pull prop
7 Vertical waler
8 Anchorage
9 Formwork
BASIC COMPONENTS: PDF Download





